Sarma Thermal Power Station Phase III

ghece_samra1
ghece_samra2
ghece_samra3
ghece_samra4
ghece_samra1
ghece_samra2
ghece_samra3
ghece_samra4

Project details

  • Delivery: 2014
  • EPC Contractor: Metal Constructions of Greece (METKA)
  • Owner: Samra Electric Power Generation Company
  • Consultant: Metal Constructions of Greece (METKA)
  • Location: Jordan

This project is dedicated to add‐on combined cycle power plant consisting of one (1) approximately 140 MW Steam Turbine Generator, (2) Heat Recovery Steam Generators and all related auxiliaries and systems to utilize the existing Gas turbines exhaust temperature to generate power with zero fuel addition

Some of the tasks that we successfully completed during the construction: