Boran Building
Some of the tasks that we successfully completed during the construction:
Mechanical works:
- Design the chilled and heating system for the building (the ETS room and the networks in the floors)
- Installing the ETS Room with one chilled heat exchanger and one heating heat exchanger and with total 6 pumps.
- Installing the chilled and heating networks.
- Installing all pipe works, Energy meter and controllers for district side in the ETS room.
- Installing the firefighting network system.
- Installing a stand by chiller with all pipe works and controllers.
Electrical works:
- Design and install the VFD’s panels for the chilled and heating system.
- Design and install the fire alarm system.
- Design and install the BMS for the building.